Project Information

Diaphragm wall, secant piles, soil nailing and reinforced concrete wall shoring applications were implemented. Micropiles were applied inside the structure with low-head conditions to strengthen the existing foundations.

0m2
Diaphragm Wall
0m2
Secant Pile
0m2
Shotcrete
0m
Pre-stressed Anchor

Employer:
Bayraktarlar İnşaat

Project:
Grand Tarabya Hotel Renovation Project 

Country:
Turkey

Year:
2010