Project Information
The design and construction of the İÇDAŞ Biga Shipyard Dry Dock Project, which is the largest in the Mediterranean basin, was carried out by ZETAŞ Zemin Teknik A.Ş. Diaphragm wall, bored and secant piles, jet grout techniques were used. Currently, the dry dock is actively used for ship maintenance.
0m2
Diaphragm Wall
0m
Jet Grout
0m
Bored Pile
Employer:
İÇDAŞ
Project:
Biga Shipyard Dry Dock Project
Country:
Turkey
Year:
2019