Project Information

Diaphragm walls with jet grout toe improvement and pre-stressed anchors were applied to support the basement excavation. The foundation of the structure is built on barrettes and bored piles. An O-Cell loading test was performed on the test barrette.

0m2
Diaphragm Wall
0m
Pre-stressed Anchor
0m
Jet Grout
0m
Barrettes
0m
Bored Pile

Employer:
DAAX Construction

Project:
Central Bank of Iraq Project

Country:
Iraq

Year:
2018