Project Information
Within the scope of the project, steel casings were driven to the sea floor from the barge platform and bored piles were constructed to form the bridge piers.
Employer:
Abu Dhabi Department of Transportation
(DOT)
Project:
Ras Ghoimes-Gaga Island Köprüsü Projesi
Country:
UAE
Year:
2010