Within the scope of the project, the excavation pit about 16 m deep was supported with the secant piles shoring system and 3 rows of pre-stressed anchors.

0m
Secant Pile
0m
Pre-stressed Anchor

Employer:
Rotana

Project:
Rotana Hotel Project

Country:
Lebanon

Year:
2014