{"id":7329,"date":"2021-09-08T10:16:29","date_gmt":"2021-09-08T08:16:29","guid":{"rendered":"https:\/\/www.zetas.com.tr\/?post_type=avada_portfolio&p=7329"},"modified":"2021-09-08T10:16:30","modified_gmt":"2021-09-08T08:16:30","slug":"thy-doco-ortakoy-hotel-project","status":"publish","type":"avada_portfolio","link":"https:\/\/www.zetas.com.tr\/en\/offer-portfolio\/thy-doco-ortakoy-hotel-project\/","title":{"rendered":"THY DoCo Ortak\u00f6y Hotel Project"},"content":{"rendered":"
In THY Do&Co Hotel project, a basement excavation was planned at a depth of 24 meters beside the Bosphorus Strait.\u00a0 Excavation was supported with diaphragm walls and top-down floors carried by plunge columns socketed to the bedrock.<\/p>\n
\u00a0<\/span><\/p>\n<\/div> Employer:<\/span> <\/p>\n<\/div> Project:<\/span> <\/p>\n<\/div> Country:<\/span> Year:<\/span>
\nG\u00fcryap\u0131 \u0130n\u015faat<\/strong><\/span><\/b><\/p>\n
\nTHY Do&Co Ortak\u00f6y Hotel Project<\/span><\/b><\/p>\n
\nTurkey<\/span><\/b><\/p>\n<\/div>
\n2014<\/span><\/b><\/p>\n<\/div><\/div><\/div>