{"id":7343,"date":"2021-09-08T10:41:08","date_gmt":"2021-09-08T08:41:08","guid":{"rendered":"https:\/\/www.zetas.com.tr\/?post_type=avada_portfolio&p=7343"},"modified":"2021-09-08T10:41:09","modified_gmt":"2021-09-08T08:41:09","slug":"icdas-biga-shipyard-dry-dock-project","status":"publish","type":"avada_portfolio","link":"https:\/\/www.zetas.com.tr\/en\/offer-portfolio\/icdas-biga-shipyard-dry-dock-project\/","title":{"rendered":"\u0130\u00c7DA\u015e Biga Shipyard Dry Dock Project"},"content":{"rendered":"

<\/h2><\/div>

Project Information<\/h2>\n<\/div>
<\/div>

The design and construction of the \u0130\u00c7DA\u015e Biga Shipyard Dry Dock Project, which is the largest in the Mediterranean basin, was carried out by ZETA\u015e Zemin Teknik A.\u015e. Diaphragm wall, bored and secant piles, jet grout techniques were used. Currently, the dry dock is actively used for ship maintenance.<\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
0<\/span>m2<\/span><\/div>
Diaphragm Wall<\/div><\/div><\/div>
0<\/span>m<\/span><\/div>
Jet Grout<\/div><\/div><\/div>
0<\/span>m<\/span><\/div>
Bored Pile<\/div><\/div><\/div><\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div>

Employer:<\/span>
\n\u0130\u00c7DA\u015e<\/strong><\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Project:<\/span>
\nBiga Shipyard Dry Dock Project<\/span>
\n<\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Country:<\/span>
\nTurkey<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Year:<\/span>
\n2019<\/span><\/b><\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div><\/div><\/div>