{"id":7352,"date":"2021-09-08T11:00:35","date_gmt":"2021-09-08T09:00:35","guid":{"rendered":"https:\/\/www.zetas.com.tr\/?post_type=avada_portfolio&p=7352"},"modified":"2021-09-08T11:05:43","modified_gmt":"2021-09-08T09:05:43","slug":"irak-merkez-bankasi-projesi","status":"publish","type":"avada_portfolio","link":"https:\/\/www.zetas.com.tr\/en\/offer-portfolio\/irak-merkez-bankasi-projesi\/","title":{"rendered":"Central Bank of Iraq Project"},"content":{"rendered":"
Diaphragm walls with jet grout toe improvement and pre-stressed anchors were applied to support the basement excavation. The foundation of the structure is built on barrettes and bored piles. An O-Cell loading test was performed on the test barrette.<\/p>\n<\/div>
Employer:<\/span> Project:<\/span> Country:<\/span> Year:<\/span>
\nDAAX Construction<\/strong><\/span><\/b><\/p>\n<\/div>
\nCentral Bank of Iraq Project<\/strong><\/span>
\n<\/b><\/p>\n<\/div>
\nIraq<\/span><\/b><\/p>\n<\/div>
\n2018<\/span><\/b><\/p>\n<\/div><\/div><\/div>