{"id":7374,"date":"2021-09-08T12:23:36","date_gmt":"2021-09-08T10:23:36","guid":{"rendered":"https:\/\/www.zetas.com.tr\/?post_type=avada_portfolio&p=7374"},"modified":"2021-09-08T12:23:36","modified_gmt":"2021-09-08T10:23:36","slug":"ras-ghoimes-to-gaga-island-bridge-project","status":"publish","type":"avada_portfolio","link":"https:\/\/www.zetas.com.tr\/en\/offer-portfolio\/ras-ghoimes-to-gaga-island-bridge-project\/","title":{"rendered":"Ras Ghoimes to Gaga Island Bridge Project"},"content":{"rendered":"

<\/h2><\/div>

Project Information<\/h2>\n<\/div>
<\/div>

Within the scope of the project, steel casings were driven to the sea floor from the barge platform and bored piles were constructed to form the bridge piers.<\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
0<\/span>m<\/span><\/div>
Bored Pile<\/div><\/div><\/div><\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div>

Employer:<\/span>
\nAbu Dhabi Department of Transportation
\n(DOT)
\n<\/strong><\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Project:<\/span>
\nRas Ghoimes-Gaga Island K\u00f6pr\u00fcs\u00fc Projesi<\/span>
\n<\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Country:<\/span>
\nUAE
\n<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Year:<\/span>
\n2010<\/span><\/b><\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div><\/div><\/div>