{"id":8000,"date":"2022-06-03T17:41:31","date_gmt":"2022-06-03T15:41:31","guid":{"rendered":"https:\/\/www.zetas.com.tr\/?post_type=avada_portfolio&p=8000"},"modified":"2022-06-03T17:41:31","modified_gmt":"2022-06-03T15:41:31","slug":"wakrah-wukair-drainage-tunnel-project","status":"publish","type":"avada_portfolio","link":"https:\/\/www.zetas.com.tr\/en\/offer-portfolio\/wakrah-wukair-drainage-tunnel-project\/","title":{"rendered":"Wakrah & Wukair Drainage Tunnel Project"},"content":{"rendered":"
Project Information<\/strong><\/span><\/b><\/p>\n<\/div> Execution of rock grouting works around the 8 nos shafts (Dia:15m, Depth:60m) and conventional tunnelling (NATM) sections in order to reduce the excessive water ingress during excavation and TBM launching operation to the minimum possible level.<\/p>\n<\/div> Employer:<\/span> Proje:<\/span> Country:<\/span>
\nPORR – HBK – MIDMAC JV<\/strong><\/span><\/b><\/p>\n<\/div>
\nWakrah & Wukair Drainage Tunnel Project<\/span>
\n<\/b><\/p>\n<\/div>
\nQatar
\n<\/span><\/b><\/p>\n<\/div>